Oil & Gas
2015-16
To provide basic and detail engineering for LNG Terminal at Andhra Pradesh, India.
Floating Storage Units (FSU) shall berth at the port for unloading their cargos. Loading arms with the necessary safety provisions will unload the cargo at a steady rate over about 5 days. The cargo will be unloaded at cryogenic conditions (-163°C). In addition to that, boil-off gas will also be unloaded from the FSU using a dedicated loading arm. The control valve unit at the jetty will provide additional safety provisions. This valve unit will be connected by an insulated pipeline to the storage facility which is about 2200-2500 meters away.
There are about 38 persons
Total duration of the project is 16 months