LNG STORAGE AND REGASIFICATION FACILITY

Home Project LNG Storage And Regasification Facility

REFINERY, OIL & GAS - KRISHNAPATNAM PORT, INDIA

Sector of activity

Oil & Gas

Year of completion

2015-16

Project Mandate

To provide basic and detail engineering for LNG Terminal at Andhra Pradesh, India.

Project Description

Floating Storage Units (FSU) shall berth at the port for unloading their cargos. Loading arms with the necessary safety provisions will unload the cargo at a steady rate over about 5 days. The cargo will be unloaded at cryogenic conditions (-163°C). In addition to that, boil-off gas will also be unloaded from the FSU using a dedicated loading arm. The control valve unit at the jetty will provide additional safety provisions. This valve unit will be connected by an insulated pipeline to the storage facility which is about 2200-2500 meters away.

THE PROJECT FEATURES

SERVICES PROVIDED

NUMBER OF EQUIPMENT

Professional personnel assigned to project

Number of persons (Peak Load)

There are about 38 persons

Duration
(Months)

Total duration of the project is 16 months